The 2027 DFW Remodel Budget Worksheet (Printable)
Every line of a kitchen, bath or whole-home budget on one printable page, with blank columns for each bid. Plus the contingency rule, the allowance trap, change orders, and what is different about a 2027 budget.
Remodel budgets rarely break on the big lines. Everyone prices cabinets and countertops carefully. Budgets break on the lines nobody wrote down: the permit, the dumpster, the faucet you meant to buy yourself, the tile allowance that buys tile you would never pick.
A remodel budget worksheet lists every line of the job (design, permits, demolition, plumbing, electrical, cabinets, counters, tile, fixtures, appliances, flooring, paint) with columns for each bid’s number, any allowance and your notes.
Add a 10–20% contingency for what the walls hide. Our DFW kitchens run $25,000–$95,000, baths $10,000–$60,000; your price is set at the estimate visit.
This worksheet puts every line of a kitchen, bath or whole-home job on one printable page. It also covers what changes in a 2027 budget.
The worksheet (print it, or copy it into a spreadsheet)
Print this page from your browser, or copy the table into a spreadsheet. Use one copy per bid:
- Your quote: the bidder’s number for that line. If a bid lumps lines together, write the total on the first one and “included above” on the rest.
- Allowance: the amount, if the line is a placeholder for something not chosen yet, and whether it covers material only or material installed.
- Notes: what the line includes and what it leaves out. Treat a blank line as a question for the bidder.
Sources: TDLR, 2026 NEC adoption · Texas Comptroller, appraisal limits.
Start with the range for the whole job
Size the whole job before you fill in the lines. Our published DFW ranges are $25,000–$95,000 for a kitchen, $10,000–$60,000 for a bathroom and $95,000–$350,000 for a whole-home renovation, with a $10,000 minimum. Your own price is set at the estimate visit.
Layout decides most of where a job lands: keeping walls, plumbing and the drain where they are can cut a project by a third. Cabinetry is usually the largest single line, and stone and tile choices move the number too. Our Dallas kitchen remodeling page breaks the kitchen range into tiers, and our Plano bathroom remodeling page does the same for baths. The remodeling cost calculator places your project inside those ranges by size, finish level and add-ons.
How big should the contingency be?
Hold 10% to 20% of the construction subtotal, closer to 20% the older the house.
HUD uses the same range. Its rules for FHA Standard 203(k) renovation loans require a contingency reserve of 10% to 20% of the repair and improvement costs on any house 30 years or older. By the end of 2027, that covers every house built in 1997 or earlier.
The reason sits at the bottom of our calculator’s list of cost drivers: what is behind the wall. Cast-iron drains, aluminum wiring, a failed shower pan. None of it shows in a walkthrough photo. Any of it can show up on demolition day. On our jobs, a problem found behind a wall is documented and reviewed with you before any added work starts.
It pays for what the walls hide. Spend it on an upgrade in week two, and it is gone when the drain line turns out to be cast iron in week three.
Not sure which of these applies to your house? A short conversation settles it faster than any calculator.
The allowance trap
An allowance is a placeholder: a dollar amount in the bid for something you have not chosen yet, such as tile, faucets, light fixtures or appliances. It is a guess with a dollar sign on it.
A low allowance makes a bid look cheaper. You find the real number at the tile store, when the tile you like costs more than the allowance and the difference lands on you. Ask three questions about every allowance:
- What does it buy? A named product or finish level, written next to the number.
- Material only, or installed? A large tile or a patterned layout costs more to set. With stone and tile, material cost moves, but labor moves more.
- How is an overage billed? In writing, before you sign.
Then total the allowance column for each bid. When a big share of a bid sits in allowances, that bid is not a price yet.
What a change order is
A change order is a written change to the scope and the price after the contract is signed. It lets a remodel absorb a new idea, or a surprise behind a wall, without an argument later about what was agreed.
On our jobs, no change goes ahead until you approve its scope and price in writing. Our Plano master bath had three change orders, each agreed in writing, for added work such as a walk-in closet system and a bedroom repaint.
“Priced and signed before the work happens, never after. Most change orders on our jobs are homeowner upgrades mid-project, not surprises we should have caught.”
Log every change order at the bottom of the worksheet: date, what changed, amount, approval. A surprise behind the wall comes out of the contingency. An upgrade is new money, so decide where it comes from before you sign.
What changes in a 2027 budget
Imported cabinets and vanities: the tariff step
Imported kitchen cabinets and vanities from most countries have paid a 25% Section 232 duty since October 14, 2025 (the UK, the EU and Japan have separate rates). Proclamation 11000, signed December 31, 2025, pushed the step to 50% back a year, to January 1, 2027. When we last checked the Federal Register, on November 20, 2026, that was still the date. It slipped once, so it could slip again. The step does not apply to countries that reach a qualifying agreement with the U.S.
It touches one worksheet line, line 8 (cabinets and vanities), and only when they are imported. Ask each bidder where the boxes are made and the date their cabinet price was set. A 2026 price on imported boxes may not hold for an order placed in 2027.
The 25C and 25D credits are gone
If an older budget subtracts a federal energy tax credit, delete the line. Neither credit applies to a 2027 job. Per the IRS, 25C (energy-efficient home improvements) ends for property placed in service after December 31, 2025, and 25D (solar and batteries) ends for expenditures made after that date.
Permit fees are not a percentage of your job
Since 2019, Texas cities may not base a residential building permit or inspection fee on the value of the home or the cost of the work (Local Government Code §214.907). The permit line comes off the city’s fee schedule. If a bid shows the city permit as a percentage of your project, ask where that number came from. On our jobs, we pull the permits and coordinate the city inspections.
Sales tax: where it hides
The Texas Comptroller says labor to repair or remodel a home is not taxable. Materials are. On a lump-sum bid, the contractor pays tax on materials when buying them and adds no tax to your bill. On a separated bid, tax is added to the materials charge. What you buy yourself is taxed at checkout, at up to 8.25% combined. Add the tax to a separated bid before you compare it with a lump-sum one.
How to compare bids line by line
Same scope on every bid
Give every bidder the same list: the rooms, any layout change, and what you will supply yourself. Bids for different jobs cannot be compared.
One worksheet per bid
Fill in every line. Where a bid is silent, write “not shown” and ask.
Total the allowances
Compare them apart from the bid totals.
Check the quiet lines
Permits, protection, disposal, cleanup and supervision. A bid that leaves them out looks cheaper until they come back as change orders.
Even out the tax
Put lump-sum and separated bids on the same footing.
Read the paper
The payment schedule, how changes are approved, and what is warranted in writing, for how long. Ours is a written one-year warranty on labor and workmanship from substantial completion, and manufacturer warranties on fixtures and materials pass to you.
Tell us what you are planning. We will walk your house, tell you what is actually possible, and put a real number on it before you commit to anything.
What our DFW jobs put on the worksheet
The slab is a line
Most North Texas houses sit on a concrete slab. On our Plano master bath the tub moved, so the slab was cut before any tile went down. On a slab, a drain that moves gets its own line: line 4 on the worksheet.
So is what goes under the floor
Slabs release moisture upward. On our Garland whole-house refresh, the moisture barrier under the new vinyl plank had its own line in the contract. On your worksheet it sits on line 13; if a flooring bid never mentions a barrier, ask.
Owner-bought finishes are real money, and real time
On the Plano bath, the homeowners chose and bought their own tile, tub, fixtures and hardware. The build took four weeks on site; the calendar ran longer while those finishes were bought. On your worksheet those purchases go on line 18, with the sales tax on line 19.
Small lines belong in writing
In Garland, the homeowners supplied wallpaper for the half bath and we hung it. That one choice touched three lines: the paper on line 18, the labor to hang it in our contract, and those walls taken off the paint line.
Check your numbers in our calculator
Once the worksheet has numbers in it, run the project through our free remodeling cost estimator. Pick the project type, size and finish level, then add the extras that most often go missing from a low bid, such as moving plumbing or a full lighting plan. The published ranges are open to read; your project’s figures appear once you send your details, split into construction, add-ons, and design, permits and management. If a bid sits far below where the calculator lands, go back to the worksheet and find the missing line.
When you want a real number, the first visit is free, takes about an hour and needs no deposit. The 3D design is free and comes before you sign, and the estimate gives one price for the agreed scope.
Questions we get
How do I make a budget spreadsheet for a home renovation?
List every line of the job before you collect bids: design, permits, demolition, plumbing, electrical, cabinets, counters, tile, fixtures, appliances, flooring and paint. Give each line three columns: the bid’s number, any allowance, and notes. Add 10–20% of the construction subtotal as contingency, then the costs outside the contract: materials you buy yourself, sales tax on them, and financing. The worksheet on this page prints from your browser or copies into a spreadsheet.
How much contingency should I add to a remodel budget?
Plan on 10% to 20% of the construction cost, closer to 20% for an older house. HUD’s FHA Standard 203(k) renovation loans require a 10–20% contingency reserve on homes 30 years or older, which by the end of 2027 means homes built in 1997 or earlier. Keep it for what the walls hide, such as old drain lines or wiring, not for upgrades.
What is an allowance in a remodeling contract?
An allowance is a placeholder amount for something you have not chosen yet, such as tile, faucets, lighting or appliances. If what you pick costs more, you pay the difference. Ask what each allowance buys, whether it covers material only or installation too, and how an overage is billed. Then total the allowances separately when you compare bids.
What is a change order in a remodel?
A change order is a written change to the scope and the price after the contract is signed, either for an upgrade you add or for a problem found behind a wall. On our jobs, no change goes ahead until you approve its scope and price in writing. Log each one on your budget: surprises come out of the contingency, upgrades are new money.
Will kitchen cabinets cost more in 2027 because of tariffs?
Imported ones can. Imported kitchen cabinets and vanities from most countries have paid a 25% Section 232 duty since October 2025 (the UK, the EU and Japan have separate rates). Proclamation 11000 pushed a step to 50% back a year, to January 1, 2027. That was still the date on November 20, 2026, but it has slipped once and could slip again. The step applies to imported cabinets and vanities, not to tile, labor or permits. Ask each bidder where the cabinets are made and when the cabinet price was set.
Do you pay sales tax on a home remodel in Texas?
Not on the labor. The Texas Comptroller says labor to repair or remodel residential property is not taxable. Materials are taxed: inside the price on a lump-sum contract, added to the materials charge on a separated contract, and at checkout, at up to 8.25% combined, when you buy materials yourself.
Is there a free remodel cost estimator for DFW?
Yes. Our remodeling cost calculator is free. It places a kitchen, bathroom, whole-home or other project inside our published DFW ranges by size, finish level and add-ons. The ranges are open to read, and your project’s figures appear once you send your details. Use it alongside the printable worksheet on this page.
Write every line down, even the small ones. Hold 10–20% for what the walls hide, total the allowances on their own, and log every change in writing. For 2027, ask where the cabinets are made and delete any federal energy credit from an old budget. Then check the total in the calculator.
Related from the journal

When you want a real number, the first visit is free.
1-year workmanship warranty · serving 21 communities across Dallas–Fort Worth.
Prefer to talk? (469) 850-7087 · or use the contact page.