How Long Does a Home Addition Take in DFW?
A bump-out, a wing, a second story and a backyard casita each run on a different calendar. Here is the addition timeline phase by phase — design, permits, foundation, dry-in, trades, finish — and the DFW-specific variables that stretch it.









