
Garden tub to walk-in shower in DFW: what it costs, and what the slab decides
Plenty of DFW master baths from the 1980s and 1990s still have a big drop-in tub in a tiled deck. In one Plano master bath we remodeled, moving that tub started with a saw through the concrete floor. Here is what the swap costs on our published tiers, and why the drain decides more than the tile does.
What does it cost to turn a garden tub into a walk-in shower in DFW?
At UHS Remodeling, a garden-tub-to-walk-in-shower conversion in DFW is priced on our bathroom tiers, $10,000 to $60,000, and $10,000 is our minimum job. The biggest swing is the plumbing: keeping the toilet, sink and shower in place saves about $3,000–$6,000, while each fixture moved through the slab adds about $1,500–$4,000 and 2–3 days.
Where your bath lands in that range comes down to three choices: where the new shower drains, whether a tub stays, and whether you want a curb. In a bathroom, tile labor and plumbing relocation usually cost the most. You choose the tile. The drain location is often decided by the concrete under it.
Tiers and build weeks as printed on our Plano bathroom remodeling page, read 2026-11-24. Build weeks are construction only; design, selections and permits come first.
On a slab, the layout is the budget.
Why the garden tub is usually the first thing to go
The before photo in one of our own Plano master baths is the classic version: an almond drop-in tub set in a tiled deck, a shower behind a framed sliding glass door, a single-sink vanity with cream raised-panel doors. Nothing was broken. The room was simply from a different decade.
If your master bath looks like that, our bathroom remodeling page shows what each tier changes in a room like it.
Opening the floor also shows what is under it. In homes built in the 1980s and 1990s, the drain under an old mud-set shower or garden tub can be galvanized or cast iron, the subfloor can have moisture damage, and the venting can be undersized. Each one is brought up to current code once it is exposed, so we look for them up front, before the estimate, not after demolition.
Option 1, 2 or 3: shower only, shower plus tub, or curbless
Shower in the old tub’s footprint, drain stays put.
The lightest version. The shower goes where the plumbing already is, so no concrete is cut, and this is where the $3,000–$6,000 saving comes from. You give up the soaking tub.
Walk-in shower, and the tub moved somewhere new.
The first Plano job below did exactly this. Moving the tub moves its drain, and on a DFW slab that means cutting concrete. Plan on about $1,500–$4,000 and 2–3 extra days for each fixture you relocate, plus new tile over the patched floor.
Curbless (zero-step) shower.
A walk-in shower without a curb needs the slab modified and proper waterproofing membranes. Here the concrete work is the design.
“Typical tier” follows the scope lines in the tier table above; your design sets the real number.
Not sure which of these applies to your house? A short conversation settles it faster than any calculator.
Should you keep a tub at all?
Neither of the two Plano baths below gave up its tub. One moved the tub through the slab; the other has a freestanding tub beside a curbless shower. If your hall bath already has a tub, the master can go shower-only. If the master tub is the only one in the house, think before it goes: we recommend keeping one tub somewhere in the home, because families with young children look for it at resale.
What we see on DFW jobs: two Plano master baths
The tub that had to move through the slab. In this Plano master bath, the owners wanted the tub moved, two sinks instead of one, a walk-in shower behind frameless glass and an open walk-in closet. That first request, moving the tub, is the one that changes a project.
Our case study calls the tub move “a concrete job with a plumbing job inside it.” The crew saw-cut the slab, dug down to the drain line, re-routed it for the new tub position, set rebar, backfilled and compacted, and poured back to the original floor height. The slab work was priced from the start, and the number did not move because of it.
Then the part you never see once the tile is up: a new shower pan, a waterproofing membrane carried through corners, seams and penetrations, and a flood test before any tile went down. The pan was plugged, filled with water and left to stand. That is the last cheap moment to find a leak.
Construction took 4 weeks on site, demolition to walkthrough. The calendar ran longer because the owners chose and bought their own tile, tub, fixtures and hardware, and were away for part of it. On a bathroom, the crew is rarely the slow part. Material selection is. The job carried three change orders, each agreed in writing, and six payments tied to finished stages.
The curbless shower, and a tub fed through the floor. In a West Plano Estates bath, the owners replaced a fiberglass tub/shower insert with a black freestanding soaking tub and a curbless walk-in shower with a linear drain. Two details there are slab work in disguise: a curbless pan has to be recessed, and on a North Texas slab that means working inside the concrete; and the floor-mounted tub filler is supplied through the floor, not the wall. That project was a $32,000 contract and took 4 weeks.
“We cut the slab before we did anything pretty.”
The slab question to ask any contractor
Most DFW homes built since the 1990s sit on a post-tension slab: steel cables inside the concrete, tensioned to thousands of pounds. Look for a round stamp in the garage floor or a PT note on the slab edge. Cutting or drilling that slab without locating the cables first is dangerous and expensive.
So before anyone cuts your floor for a new shower drain or a moved tub, ask one question: how will you locate the cables? The answer should be the foundation plans or an electronic slab scan, and the work should be permitted and inspected. At UHS, every slab penetration is mapped and permitted before demolition day.
Do you need a permit to swap a tub for a shower?
It depends on whether the plumbing moves. The City of Plano’s handout When is a Permit Required? says permits are not required when replacing fixtures on existing plumbing, and it lists plumbing work among the projects that need one (City of Plano handout). Rules differ by city, so check yours in our DFW remodeling permit guide. When a permit is needed on our jobs, we pull it.
Tell us what you are planning. We will walk your house, tell you what is actually possible, and put a real number on it before you commit to anything.
Or read the numbers first: Plano bathroom remodeling.
Five mistakes we see when the garden tub comes out
Choosing the layout before checking the drain.
Where the drain sits decides whether the floor gets cut, so find it before you fall for a floor plan.
Demolishing before selections are final.
Tile, tub, fixtures and glass chosen before demo is the biggest schedule lever you control; on the Plano tub move, selection set the calendar, not the crew.
Removing the only tub in the house.
Fine for you, harder at resale with young families.
Trusting waterproofing nobody tested.
Ask whether the pan gets a flood test before tile.
Letting anyone cut a post-tension slab blind.
Ask how the cables are found, every time.
How long does it take, and what happens next?
A garden-tub-to-walk-in-shower job follows our bathroom build times: 3–4 weeks at Essential, 5–7 at Refined and 7–8 at Custom. Each fixture moved through the slab adds 2–3 days. Design, selections and any permit come first, and on our jobs the build runs fastest when every selection is made before demolition.
If your budget sits near the bottom of the range, our $10K bathroom post shows where that number fits.
The first step is a free in-home visit to see the bathroom and agree the scope with you. You get a written estimate for the agreed scope within 24 hours of the visit. Want a rough number first? Try the remodeling cost calculator.
Garden tub to walk-in shower: quick answers
How much does a walk-in shower cost in DFW?
UHS Remodeling prices a walk-in shower as part of a bathroom remodel, $10,000 to $60,000, with a $10,000 minimum job. A walk-in shower with a niche and bench is in our Refined tier scope, $32,000 to $45,000 for the whole bathroom. A tiled shower with a glass door is Essential scope, $10,000 to $32,000.
How much does it cost to remove a Jacuzzi tub and remodel the bathroom?
Taking out a jetted (Jacuzzi-style) or garden tub is priced as a bathroom remodel on our tiers, $10,000 to $60,000, and $10,000 is our minimum job. The drain sets the number: a shower built where the plumbing already runs avoids slab work, while each fixture moved through the slab adds about $1,500–$4,000 and 2–3 days.
What should I ask a tub-to-shower conversion company in DFW?
Ask four things before hiring anyone to replace a tub with a shower in DFW. How will you locate any post-tension cables before cutting the slab? Will the shower pan get a flood test before tile? Who pulls the plumbing permit? When will I get a written estimate? At UHS Remodeling, it arrives within 24 hours of the visit.
Can the walk-in shower go where the garden tub was?
Yes, and it is usually the lowest-cost layout. Putting the shower where the drain already runs usually means no slab cut, and keeping the toilet, sink and shower in place saves about $3,000–$6,000. You give up the soaking tub, so if it is the only tub in the house, we recommend keeping one in another bathroom for resale to families with young children.
Does a curbless walk-in shower cost more than one with a curb?
Usually, yes. A walk-in shower without a curb needs the slab modified and proper waterproofing membranes, so the concrete work is part of the design. Slab cuts add 2–3 days to the build. A full wet-room layout is in our Custom tier scope, $45,000 to $60,000+ for the bathroom.
- Bathroom tiers: $10K–$32K / $32K–$45K / $45K–$60K+, build 3–4 / 5–7 / 7–8 weeks. $10,000 is our minimum job.
- Keeping fixtures in place saves about $3K–$6K. Each fixture moved through the slab adds about $1,500–$4,000 and 2–3 days.
- Keep at least one tub in the house.
- Ask how the slab cables will be located before anyone cuts.
- Written estimate within 24 hours of the visit.
Related from the journal

Plano Master Bathroom Remodel: Relocating the Tub Through the Slab
Project
Plano Bathroom Remodel: Building a Spa-Inspired Daily Retreat
Project
Is $10,000 Enough for a Bathroom Remodel in DFW? (2026 Real Numbers)
13 min read
Thinking about the tub in your master bath?
Start with a free in-home visit, and you get a written estimate for the agreed scope within 24 hours of the visit.
Prefer to talk? (469) 850-7087 · or use the contact page.



